Penn Foster 584801 – Excel graded project with screenshots – Perfect solution – Instant Delivery

Lab Price = $12
Please feel free to send us your queries at: [email protected]
Payment methods

Add to Cart

Buy Now

View Cart


Problem Statement

© PENN FOSTER, INC. 2016
Graded Project
Excel 2016
© PENN FOSTER, INC. 2016 EXCEL 2016 PAGE 1
Graded Project
INTRODUCTION 2
INSTRUCTIONS 2
SCORING GUIDELINES 6
SUBMITTING YOUR PROJECT 8
INTRODUCTION
CONTENTS
© PENN FOSTER, INC. 2016 EXCEL 2016 PAGE 2
Graded Project
GRADED PROJECT
EXCEL 2016
INTRODUCTION
This project requires you to develop a spreadsheet that tracks the cost of elementary
school supplies distributed to teachers over a two-month period. You’ll assume the role of
Office Manager, who has multiple responsibilities, including distributing and maintaining
classroom supplies. For this project, you must prepare an Excel spreadsheet and chart
that will be sent to the school District Manager.
INSTRUCTIONS
CREATE A SPREADSHEET
1. Start Excel and create a new workbook.
2. Enter data as shown in Figure 1, sizing columns as necessary, and then save your
file, naming it School Supplies.
Figure 1
3. Merge and center cells A1 through H1. Format the school name as Title style.
4. Merge and center cells A2 through H2. Format the label as Heading 1 style.
5. Bold the labels in row 4 and right align the labels above numeric values.
© PENN FOSTER, INC. 2016 EXCEL 2016 PAGE 3
Graded Project
Figure 2
7. In column D, enter appropriate formulas to calculate the September costs for each
school supply. Your formulas must use cell references. Format the calculated
values as Currency with 2 decimal places.
8. In cell A16, enter the label “Grand Total” and then format it as bold.
9. In cell D16, enter a formula that uses a function to calculate the total of the column.
10. In column E, enter formulas that calculate the percentage of the grand total for
each type of school supply (total cost of each item divided by the grand total). Your
formulas must use appropriate absolute cell references. Format the calculated
values as Percentage with 0 decimal places.
11. In cell E16, enter a formula that uses a function to calculate the total of the column
(it should total 100%).
12. Repeat the process you used in steps 7–11 to calculate values for October.
6. Format the Cost/Unit values as Currency with 2 decimal places. Your spreadsheet
should look like Figure 2.
© PENN FOSTER, INC. 2016 EXCEL 2016 PAGE 4
Graded Project
13. Sort the school supplies alphabetically. (Be sure to select cells A5:H14 to sort the
entire row of data.) Your spreadsheet should look similar to Figure 3.
(Continued)
Figure 3
Figure 4
14. Save the modified spreadsheet.
CREATE A CHART
1. Create a chart by first selecting the cell ranges for the chart. Drag from cell A4 to
A14 to select the range and then press and hold the Ctrl key while you drag from
cell D4 to D14. Continue to press and hold the Ctrl key while dragging from cell G4
to G14. Your selected cells should look like Figure 4.
2. Insert a 3-D Clustered Column chart.
3. Change the chart title to read “Cost of Supplies.”
© PENN FOSTER, INC. 2016 EXCEL 2016 PAGE 5
Graded Project
4. Position the chart with the upper-left corner in cell A18 and then size the chart until it extends to column H, as shown in Figure 5.
Figure 5
5. Put the following information into cell A41:
OO
Y
our name
OO
Y
our email address
OO
Y
our student number
OO
Course name and number
OO
Project number (584801) 6. Save and close the workbook.
© PENN FOSTER, INC. 2016 EXCEL 2016 PAGE 6
Graded Project
SCORING GUIDELINES
RUBRIC
Skill/
Grading Criteria
Exemplary
(4)
Proficient
(3)
Fair
(2)
Poor
(1)
Not
Evident (0)
Enter data
The correct data has been entered into the appropriate cells.
Most of the correct data has been entered into the appropriate cells.
Some of the correct data has been entered into the appropriate cells.
Minimal
correct data has been entered anywhere.
No attempt has been made to enter data into the spreadsheet.
Size
columns
All columns are sized to appropriately display labels and values.
Some columns are sized to appropriately display labels and values.
Few columns are sized to appropriately display labels and values.
Only one
column is sized to appropriately display labels and values.
No attempt has been made to change
column widths.
Apply an Excel style
All cells are in the indicated style.
All cells have a style applied, but they are in the wrong style.
One cell has an applied style, in the indicated style.
One cell has an applied style, but it is the wrong style.
No attempt has been made to apply Excel styles.
Merge and
center cells
Labels in rows 1 and 2 have been merged and centered above the appropriate cells.
The label in one row has been merged and centered.
Labels in either row 1 or 2 have been merged
without centering.
An attempt has been made to center labels above the data.
No attempt to merge cells or
center labels has been made.
Format labels
The appropriate labels have been formatted as instructed.
Some of the appropriate labels have been formatted as instructed.
Appropriate labels have some formatting but may not be as instructed.
Some labels have been formatted.
No attempt to format labels has been made.
Format values as Currency
The appropriate values have been formatted as Currency with 2 decimal places.
The appropriate values have been formatted as Currency
without 2 decimal places.
The appropriate values display a $ but have not been formatted as Currency.
The wrong values have been formatted as Currency.
No attempt has been made to
format values as Currency.
Format values as Percentage
The appropriate values have been formatted as Percentage with 0 decimal places.
The appropriate values have been formatted as Percentage displaying a decimal portion.
The appropriate values display a % but have not been formatted as Percentage.
The wrong values have been
formatted as Percentage.
No attempt has been made to format values as Percentage.
(Continued)
© PENN FOSTER, INC. 2016 EXCEL 2016 PAGE 7
Graded Project
Use
formulas with
relative cell
references
All Cost values have been calculated using 2 relative cell references.
Cost values have been
calculated using 1 relative cell reference.
N/A
N/A
Cost values do not use any cell references.
Use
formulas with
functions
All Grand Total values have been calculated using a SUM function.
N/A
Grand Total values have been calculated using a SUM function but did not include all cell references.
N/A
Grand Total values have not been calculated with a SUM function.
Use
formulas with
absolute cell
references
The % of Grand Total values have been calculated with a formula that includes an absolute cell reference.
N/A
N/A
N/A
The % of Grand Total values have not been
calculated using
absolute cell references.
Sort data
Supply data (rows 5 through 14) has been sorted
alphabetically by supply name.
Supply data (rows 5 through 14) has been sorted in reverse alphabetical order or by something other than
supply name.
N/A
Only the Supply data in column A has been sorted, making the spreadsheet data inaccurate.
No attempt has been made to sort the data.
Create a chart
A 3-D Column chart has been created using the correct data.
A chart of any type has been created using the correct data.
A chart has been created using some of the correct data.
An attempt to create a chart has been made.
No attempt has been made to
create a chart.
Edit a chart title
The chart title has been appropriately changed.
The chart title has been changed to unspecified text.
N/A
An attempt has been made to change the chart title.
No attempt has been made to change the chart title.
Move and size a chart
The chart has been moved and sized to the specified location and dimensions.
The chart has been moved to the specified location or sized, but not both.
N/A
N/A
No attempt has been made to move or size the chart.
© PENN FOSTER, INC. 2016 EXCEL 2016 PAGE 8
Graded Project
SUBMISSION CHECKLIST
Before submitting your project, make sure you’ve correctly completed the following: q Create, save, and name an Excel file. q Enter data and labels. q Format labels with indicated styles. q Merge and center labels. q Format data with Currency and Percentage formats to the correct number of decimal places. q Size columns appropriately. q Use formulas that include a function where applicable. q Use relative and absolute cell references in formulas. q Sort data. q Create a chart from nonadjacent data. q Edit a chart.
SUBMITTING YOUR PROJECT
Each project is individually graded and therefore could take approximately 5–7 business days to grade. Make sure the following information is in cell A41:
OO
Y
our name
OO
Y
our email address
OO
Y
our student number
OO
Course name and number
OO
Project number (584801)
To submit your graded project, follow these steps:
1. Go to http://www.pennfoster.edu.
2. Log in to your student portal.
3.
Click on Take Exam next to the lesson you’re working on.
4. Follow the instructions provided to complete your exam.
Be sure to keep a backup copy of any files you submit to the school!

Relevant Material
Screenshots
Screenshot: TableandChart
Screenshot: TableandChart
Instructions
* If you want to purchase multiple products then click on “Buy Now” button which will give you ADD TO CART option.Please note that the payment is done through PayPal.
* You can also use 2CO option if you want to purchase through Credit Cards/Paypal but make sure you put the correct billing information otherwise you wont be able to receive any download link.
* Your paypal has to be pre-loaded in order to complete the purchase or otherwise please discuss it with us at [email protected].
* As soon as the payment is received, download link of the solution will automatically be sent to the address used in selected payment method.
* Please check your junk mails as the download link email might go there and please be patient for the download link email. Sometimes, due to server congestion, you may receive download link with a delay.
* All the contents are compressed in one zip folder.
* In case if you get stuck at any point during the payment process, please immediately contact us at [email protected] and we will fix it with you.
* We try our best to reach back to you on immediate basis. However, please wait for atleast 8 hours for a response from our side. Afterall, we are humans.
* Comments/Feedbacks are truely welcomed and there might be some incentives for you for the next lab/quiz/assignment.
* In case of any query, please donot hesitate to contact us at [email protected].
* MOST IMPORTANT Please use the tutorials as a guide and they need NOT to be used for any submission. Just take help from the material.
******************************************** Good Luck ***************************************************
Privacy Policy
We take your privacy seriously and will take all measures to protect your personal information.
Any personal information received will only be used to fill your order. We will not sell or redistribute your information to anyone.
Refund Policy
Incase you face any issues with the tutorial, please free to contact us on [email protected]
We will try our best to resolve the issue and if still persists we can discuss for a refund in case its required.
Payment Details
Lab Price = $12
Please feel free to send us your queries at: [email protected]
Payment methods

Add to Cart

Buy Now

View Cart

2 Comments

  1. Do you have tutoring for the penn foster computer applications graded project? Not the word or excel one. You guys already helped me with those.

Leave a Reply